Page 1 of 1

Cable Car Update

PostPosted: Wed May 16, 2012 1:42 pm
by Rachel
The construction of London’s newest transport link reached another milestone as all 34 cabins of the Emirates Air Line took off for their inaugural load testing flight. Mace is working closely with cable car specialist Doppelmayr to carry out the testing.

This extensive testing programme is part of a series of rigorous safety trials and follows last month’s completion of the Emirates Air Line’s three towers with cabling extended across the river. The cabins will travel across 1.1km of cable, gliding 90m above the Thames with weights representing the maximum number of passengers before the Emirates Air Line opens for passenger service in summer 2012.

The innovative Emirates Air Line is a key part of the Mayor’s plans to revitalise east London and create jobs for Londoners and attract investment into the capital. It will be a much needed new river crossing with the capacity to carry up to 2,500 people per hour in each direction – the equivalent of 30 buses per hour.

The Mayor has secured £36m from Emirates to fund the connection which will create a direct link between the O2 and ExCeL, and an additional interchange between the Jubilee line and Docklands Light Railway.

Boris Johnson, the Mayor of London, said: “The speed with which we have gone from designs to safety testing of the Emirates Air Line is a clear demonstration of London’s ability to deliver world class projects and attract major investment. This new transport link is set to support my plans to transform east London into a vibrant new metropolitan quarter boasting new jobs, homes and enterprise.

“Londoners can now see this fabulous new feature of our city’s skyline being put through its paces before they can get on board themselves to breath in the stunning views it will afford.”

When the Emirates Air Line opens passengers will have spectacular views of the city including St Paul’s Cathedral, the Gherkin, Thames Barrier and the Olympic Park. It will also be possible to see as far as Wembley Stadium Arch, 15 miles away.

Laurie Berryman, Vice President UK at Emirates said: “This test flight is a significant milestone in the development of this new transport system, and brings us closer to being able to fly passengers across the Thames between the two terminals at Emirates Greenwich Peninsula and Emirates Royal Docks. This innovative form of air travel is an interesting addition to our extensive flight network, allowing us to connect with even more people in London and from across the world.”

Matt Randall, Project Director said: “The testing and commissioning of all 34 cabins over the Thames will see the system really put through its paces over the coming days. The cabins have travelled smoothly on their early journeys and we are making excellent progress on the wider construction with both Terminals and landscaping nearing completion.”

The Emirates Air Line will provide the first additional river crossing in a proposed package of measures. Following a consultation at the beginning of the year, TfL is developing proposals for further river crossings; a tunnel at Silvertown and a new ferry crossing at Gallions Reach.

[img]cable%20car%201.jpg[/img]

[img]cable%20car%202.jpg[/img]

Re: Cable Car Update

PostPosted: Sat May 19, 2012 10:36 pm
by Don
:shock: oooh no, I'd rather walk!

Re: Cable Car Update

PostPosted: Sun May 20, 2012 6:34 pm
by Rachel
Don wrote::shock: oooh no, I'd rather walk!


On water? :lol:

Re: Cable Car Update

PostPosted: Mon May 21, 2012 11:32 pm
by Rachel
Why aren't my attachments showing up here? They were when I originally posted them. Is it just me? Same for the Shard photos :crying-yellow:

I liked those pics. Especially Shard steel installation ones. I want to give you all exclusives on major London projects, but all I can see now is question marks in boxes.

Re: Cable Car Update

PostPosted: Tue May 22, 2012 12:28 am
by Nick
Sorry - that's my FUBAR & I'm not sure what to do to fix it.

Re: Cable Car Update

PostPosted: Tue May 22, 2012 12:32 am
by Rachel
Nick wrote:Sorry - that's my FUBAR & I'm not sure what to do to fix it.


PLEEEEEEASE try to sort it Nick. They were great photos. Especially the Shard steel ones. And they were true exclusives. I believe you had them before Building Magazine did.

Re: Cable Car Update

PostPosted: Tue May 22, 2012 8:25 am
by Don
Rachel wrote:
Don wrote::shock: oooh no, I'd rather walk!


On water? :lol:
:doh:

Re: Cable Car Update

PostPosted: Tue May 22, 2012 10:37 am
by Nick
Rachel wrote:
Nick wrote:Sorry - that's my FUBAR & I'm not sure what to do to fix it.


PLEEEEEEASE try to sort it Nick. They were great photos. Especially the Shard steel ones. And they were true exclusives. I believe you had them before Building Magazine did.


I was up until the early hours trying various fixes. The Photos are there, it's just the database isn't finding them. I'm going to call the cavalry.

Re: Cable Car Update

PostPosted: Fri May 25, 2012 10:18 pm
by keith
Steep hill in Lincoln would have been a better place to run it.

and it's already the best street in Britain. SO it would improve it further

Re: Cable Car Update

PostPosted: Sat Jul 28, 2012 11:11 pm
by Don

Re: Cable Car Update

PostPosted: Wed Aug 01, 2012 2:50 pm
by Nick
Boris Johnson was left hanging today when he got stuck halfway down a zip wire at an event in Victoria Park.

The Mayor of London had to be pulled the rest of the way by teams on the ground at around 13:30 this afternoon.

Boris Johnson was heard shouting "Get me a rope, get me a ladder" after he was the first person to use the zip wire. He continued "I think the brakes got stuck

http://www.itv.com/news/london/2012-08- ... -zip-wire/

Re: Cable Car Update

PostPosted: Fri Aug 03, 2012 9:58 am
by Rachel
Image

Image

Image

And my favourite ...

Image

I'm always grateful for geeks when something like this happens!